On a very windy day, the group had two tasks, one was to repair the steps at the end of the Hawthorn arch and the other to pick up litter All the wooden boards and pegs supporting the steps were replaced and backfilled with wood chip. A large amount of litter was found, bagged up and collected for disposal.
A small area of meadow was cut and raked as well.